Athens, Greece
Athens, Greece
-
location
Athens, Greece
-
year
2004
-
client
METKA S.A.
The project concerns the construction of the pedestrian bridge at Mesogion Avenue. Our contract included the construction of the steel structure of pedestrian’s deck at Mesogion Avenue. The total time that was required for the construction of this specific part was sixty five days. Particular feature of the construction was the construct requirements that came up because of the geometry and the construction’s specifications.