BSB

Athens, Greece

Athens, Greece

  • location

    Athens, Greece

  • year

    2006

  • client

    BSB S.A.

The project concerns the fabrication and the installation of steel structure for the new plant of BSB’s clothes company.

Our contract included the design, the fabrication and the installation of the curved steel roof and of all the rest steel structures.

The total weight of the steel structures came up to three hundred tons while the required time for the project’s completion was eighty days. The shape of the roof (curved) in combination to the big sections that were used, were considered the dominated feature of the project.

next project